Lots of rain this morning created some nice ponds/puddles at the construction site.
In my last post, I wondered about the diameter of the 50+ wells that will be drilled into the area under the parking lot. Dick Alton--who I am starting to think knows answers to almost everything--tells me the wells will be 1-1 1/2" in diameter. Thanks, Dick!
In other news, the drilling should go on for about three weeks, after which the parking lot will be repaved with brick pavers. Work will continue inside the church even after the parking lot reopens. The new system might very well be operational by October 1.
No comments:
Post a Comment